2023 – Rookwood Weir – Data Collation And 3D Modelling On The Fitzroy River, Queensland. $15.00 More info
2022 – Defensive CFRD Embankment Design using Dirty Rockfill in a High Seismicity Environment – Waimea Dam $15.00 More info
2016 – Hedges Dam – Upstream Face Slip from Rapid Drawdown and Subsequent Remedial Works $15.00 More info
2014 – The Appropriate Small Dam and Hydropower Project – Appropriate Hydropower Civil Design for Developing Countries $15.00 More info
2013 – Managing the risk of under-designed spillway training walls: an owner’s guide $15.00 More info
2013 – Case studies of foundation grouting using the GIN method at the enlarged Cotter Dam $15.00 More info
2012 – Evaluation of marginally non-compliant dam filter materials using the No-Erosion Filter test method $15.00 More info
2011 – Design, Construction and Operation of a Partially Lined, Ash Storage Facility Constructed from Mine Waste $15.00 More info
2010 – TOWARDS UNDERSTANDING A KARST FOUNDATION: USE OF A THREE DIMENSIONAL FOUNDATION MODEL AT DARWIN DAM $15.00 More info
2010 – Challenges Associated with Identifying and Analysing Potential Failure Mechanisms in Dam Foundations – Taum Sauk Upper Reservoir Dam & Wyaralong Dam Case Studies $15.00 More info
2010 – Analysis and Design Challenges Associated with the Catagunya Dam Restoration Project $15.00 More info
2010 – A Unique and Holistic Approach to the Erodibility Assessment of Dam Foundations $15.00 More info
2008 – Construction of the first cut-off wall by Low Headroom Cutter inside a dam tunnel in China $15.00 More info
2007 – Wave seiching and run-up effects in Lake Aviemore due to seismotectonic displacement of the lakebed $15.00 More info
1999 – Investigations on Canning Dam Concrete Gravity Structure and it’s Rehabilitation $15.00 More info