2018 – Design and Construction of Ulu Jelai Reservoir Rim Stabilisations

James Martin, Nash Kobarajah

Ulu Jelai project is a recently completed 372MW hydroelectric peak – power project located in the Cameron Highlands of Malaysia. A combination of power generating and reservoir operating conditions together with the site topography, existing road infrastructure, geology and hydrogeological conditions pose a significant risk to the viability of the project during operation. As a result, significant reservoir rim stability treatments were designed and constructed along a 3.5km section of the right abutment of t he Susu Reservoir to reduce the risk of instability to acceptable levels. This paper describes the methods of investigations, stability assessment and design aspects of the reservoir rim stability treatments that were constructed.

Buy this resource

$15.00

IMPORTANT NOTICE

System maintenance will be performed on the servers that host the ANCOLD Digital Guidelines, on Saturday, December 21st @ 10:00 PM AEDT which will require the servers to reboot.

Total downtime during that event could be up to 4 hours and will commence sharply at 10 pm AEDT.  During that time end users will not be able to view or access their secured content.