Damon Miller and Grant Jones
Mt Buller Alpine Resort has significant constraints on its capacity to store and supply potable water during times of peak demand, which impacts the ability to sustain and grow visitation to the resort, limiting optimal functioning and future development of the resort.
A proposed new 100 megalitre dam would primarily supply the resident and visitor populations with a reliable potable water source while also maintaining through snowmaking, the Resort’s amenity and functionality during winter for skiing and snow-play.
Standard dam engineering criteria of technical feasibility and environmental impact influenced the site selection and design of the new off-stream storage whilst additional key drivers unique to an alpine resort, framed around impact to existing skiable terrain and resort functionality, were critical to satisfy the resort stakeholders. The need to minimise the visual impact of the dam and integrate with the resort environment was also of high importance.
$15.00
ANCOLD is an incorporated voluntary association of organisations and individual professionals with an interest in dams in Australia.
System maintenance will be performed on the servers that host the ANCOLD Digital Guidelines, on Saturday, December 21st @ 10:00 PM AEDT which will require the servers to reboot.
Total downtime during that event could be up to 4 hours and will commence sharply at 10 pm AEDT. During that time end users will not be able to view or access their secured content.