Wark, Bob; Thomas, Louise
This paper discusses the rating curves developed for several case studies from the Pilbara and Kimberley, including the Harding Dam, Moochalabra Dam and Ophthalmia Dam. The paper will discuss the impact of underestimated rating curves on the design of infrastructure. An example has occurred at Harding Dam where the pump station was designed to be inundated at a 1:100 AEP and this is now estimated to occur at a lower AEP. The paper will also discuss methods to improve the accuracy of rating curves and the challenges associated with determining accurate rating curves.
$15.00
ANCOLD is an incorporated voluntary association of organisations and individual professionals with an interest in dams in Australia.
System maintenance will be performed on the servers that host the ANCOLD Digital Guidelines, on Saturday, December 21st @ 10:00 PM AEDT which will require the servers to reboot.
Total downtime during that event could be up to 4 hours and will commence sharply at 10 pm AEDT. During that time end users will not be able to view or access their secured content.