Justin Howes, Peter Amos
For many years Mighty River Power has operated an intensive Dam Safety Assurance Programme with respect to our nine large hydro assets, a unique run of river cascade system built between 1927 and 1972. From 2001 to 2007 the Arapuni Foundation Enhancement Project was a high profile activity, but there has also been much dam safety analysis and minor mitigation work that could be classified as “Business As Usual Dam Safety Activity” – this paper seeks to give a high level overview of the work carried out from 2000 to 2010. Items covered include; an overview of the hydraulic structures, their hydrological and geological setting, and the current dam safety regime. Examples of typical issues identified by the Programme are given on a structure by structure basis along the river. Seismic, Flooding, Emergency Planning, Documentation, Monitoring, Control, Electrical and Mechanical type issues are covered.
$15.00
ANCOLD is an incorporated voluntary association of organisations and individual professionals with an interest in dams in Australia.