Justin Howes, Peter Amos
For many years Mighty River Power has operated an intensive Dam Safety Assurance Programme with respect to our nine large hydro assets, a unique run of river cascade system built between 1927 and 1972. From 2001 to 2007 the Arapuni Foundation Enhancement Project was a high profile activity, but there has also been much dam safety analysis and minor mitigation work that could be classified as “Business As Usual Dam Safety Activity” – this paper seeks to give a high level overview of the work carried out from 2000 to 2010. Items covered include; an overview of the hydraulic structures, their hydrological and geological setting, and the current dam safety regime. Examples of typical issues identified by the Programme are given on a structure by structure basis along the river. Seismic, Flooding, Emergency Planning, Documentation, Monitoring, Control, Electrical and Mechanical type issues are covered.
$15.00
ANCOLD is an incorporated voluntary association of organisations and individual professionals with an interest in dams in Australia.
System maintenance will be performed on the servers that host the ANCOLD Digital Guidelines, on Saturday, December 21st @ 10:00 PM AEDT which will require the servers to reboot.
Total downtime during that event could be up to 4 hours and will commence sharply at 10 pm AEDT. During that time end users will not be able to view or access their secured content.