Jeffrey A. Schaefer, Ph.D., P.E., P.G. and David M. Schaaf, P.E.
In 2005 the U.S. Army Corps of Engineers (USACE) developed and implemented a Screening Portfolio Risk Assessment (SPRA) process for Dam Safety. The screening process considered loading frequency, an engineering rating to estimate a relative probability of failure, and both human life and economic consequences of failure. The results were utilized as a tool to help prioritize funding for dam safety modification projects and required studies. Three multidisciplinary cadres evaluated what was considered the worst 10% of the USACE’s dam projects in 2005 and the next worst 10% in 2006. The dams evaluated included flood control, navigation, and multi-purpose dams. Approximately seventy facilities were evaluated each year.
As a result of the aging of the USACE’s dam portfolio and the state of the art at the time of design and construction (mostly 1940’s-50’s), significant dam safety deficiencies exist at many USACE dams. This paper summarizes the major deficiencies identified from the SPRA process. Examples, including foundation seepage, karst development, embankment stability, gate deterioration, liquefiable foundations, and inadequate spillway capacity are provided along with discussion on which deficiencies contribute the greatest risk.
$15.00
ANCOLD is an incorporated voluntary association of organisations and individual professionals with an interest in dams in Australia.
System maintenance will be performed on the servers that host the ANCOLD Digital Guidelines, on Saturday, December 21st @ 10:00 PM AEDT which will require the servers to reboot.
Total downtime during that event could be up to 4 hours and will commence sharply at 10 pm AEDT. During that time end users will not be able to view or access their secured content.