Stephen Newman, Mark Foster
Construction of the Lake Buffalo Dam was completed in 1965. It was to be a temporary dam, required to operate for several years, then act as a cofferdam for the construction of a much larger dam downstream. This larger dam was never built and a risk assessment completed by Goulburn Murray Water (G-MW) in 2001 identified several dam safety deficiencies at Lake Buffalo were among the highest priorities for risk reduction measures across the G-MW dams portfolio. Specifically it identified Lake Buffalo as having inadequate flood capacity and there were also concerns about transverse cracking within the embankment.
This paper describes the detailed investigation and analysis of the embankment cracking including assessing the potential for piping through an embankment having deficient filters and known transverse cracking. The design features of the upgrade are also described including the design of the a filter buttress, a parapet wall raise, Computational Fluid Dynamics (CFD) modelling and spillway anchoring. Construction was completed in 2003.
$15.00
ANCOLD is an incorporated voluntary association of organisations and individual professionals with an interest in dams in Australia.
System maintenance will be performed on the servers that host the ANCOLD Digital Guidelines, on Saturday, December 21st @ 10:00 PM AEDT which will require the servers to reboot.
Total downtime during that event could be up to 4 hours and will commence sharply at 10 pm AEDT. During that time end users will not be able to view or access their secured content.