Craig Johnson, Phillip Solomon, Nihal Vitharana
Tank Hill Reservoir is located approximately 25km north-east of Warrnambool and forms part of the fresh water supply for the town. It was built in the 1930’s by the construction of an earthfill dam across the natural breach of the crater of an extinct volcano. The reservoir is an offline storage with a small natural catchment and has a nominal capacity of 770ML at Full Supply Level (FSL). The reservoir is operated by South West Water Authority (SWWA).
Previous investigations had identified instability issues associated with the dam embankment and the necessity for remedial work to increase the stability of the dam embankment. SKM undertook detailed survey and investigations and the proposed upgrade works include the construction of a downstream stabilising berm incorporating graded filters and a drainage system. The condition of the outlet works was investigated as part of the project, with some of these works found to be in poor condition with a risk to the security of supply, necessitating the design of refurbishment of the outlet works. The degree of siltation of the reservoir was also assessed, and some loss of capacity due to siltation was noted.
Detailed investigations were performed to determine the optimum configuration of the stabilising berm and to locate and test suitable construction materials. The embankment interface filters were designed to satisfy modern filter design criteria and were incorporated in the embankment drainage system. The condition of the outlet works, including the intake standpipe, three offtake valves and the outlet conduit beneath the embankment, were assessed via manual and CCTV inspections. An operation review, incorporating the proposed upgrade works within the framework of ongoing operation of the reservoir for supply to downstream customers was also prepared, as was a construction risk assessment.
This paper will present “extremely useful practical information” for dam design engineers, owners and operators where the whole spectrum of dam safety issues is required for the successful completion of remedial works design and construction.
$15.00
ANCOLD is an incorporated voluntary association of organisations and individual professionals with an interest in dams in Australia.