Investigations into the core material of earth fill dams are undertaken reluctantly due to the potential to cause damage to the embankment. Where investigations are required, Cone Penetration Testing (CPT) is increasingly used to assist with the geotechnical assessment of dam embankments. The risk of hydraulic fracture within embankment core material is well known and procedures are typically adopted to minimise the risk of hydraulic fracture during remediation of the holes. Backfilling is typically done in stages allowing for an initial set of the cement/bentonite grout mixture prior to subsequent lifts.
While the risk of hydraulic fracture is well understood, the lesser known risk of pneumatic fracture is a possibility where certain conditions exist. This paper discusses CPT investigations at Fairbairn Dam, operated by Sunwater in Central Queensland, and the challenges faced in undertaking the remediation of the CPT holes. The potential for pneumatic fracture of the embankment core was highlighted during the investigations and details of alternative techniques adopted for reinstatement of the holes are presented. Recommendations are made to appropriately manage the risk of pneumatic fracture when undertaking CPT’s through embankment core.
$15.00
ANCOLD is an incorporated voluntary association of organisations and individual professionals with an interest in dams in Australia.
System maintenance will be performed on the servers that host the ANCOLD Digital Guidelines, on Saturday, December 21st @ 10:00 PM AEDT which will require the servers to reboot.
Total downtime during that event could be up to 4 hours and will commence sharply at 10 pm AEDT. During that time end users will not be able to view or access their secured content.