2018 – Massingir Dam Rehabilitation Project: Construction and Operational Challenges

Peter Blersch, Charles Nyamariwata, Luis Paulo Mandlate

Following the catastrophic failure of the bottom outlet conduits of the Massingir Dam, a rehabilitation project was launched involving the installation of steel liners and the rehabilitation of the hydromechanical equipment. This paper describes the testing of an emergency gates for possible use as a control gate to maintain supply to downstream water users. It further describes the innovative use of alternative access for concreting and other services, the use and benefits of self-compacting concrete for infill concreting between the steel liner and existing concrete and the programme and cost benefits of pressurising the steel conduit prior to concrete encasement.

Buy this resource

$15.00

IMPORTANT NOTICE

System maintenance will be performed on the servers that host the ANCOLD Digital Guidelines, on Saturday, December 21st @ 10:00 PM AEDT which will require the servers to reboot.

Total downtime during that event could be up to 4 hours and will commence sharply at 10 pm AEDT.  During that time end users will not be able to view or access their secured content.