Petros Armenis, Malcolm Barker, Peter Christensen, Graham Harrington
The Canterbury Earthquake Sequence in September 2010 and February 2011 caused large areas of land to change by differing amounts throughout Christchurch, New Zealand. Land levels fell by more than 300 mm in some areas. This increased flood risk in the tidal reaches of the Avon River. Urgent repairs were completed with the objective to restore the tidal river defences to a crest level equivalent to a 1% AEP tide level. This work needed to be completed prior to impeding spring tides.
The levees will be required for up to 20 years and then probably be rebuilt on a new alignment. To better understand the risks associated with the ongoing reliance of the levees for flood protection in the interim, a risk assessment was undertaken using conventional Australian National Committee on Large Dams (ANCOLD) practices and levee design procedures. Careful consideration was made to the performance of the existing levees under seismic, flood and tidal loading from which the societal and individual risk profiles were derived. The work included the following:
This paper will present the levee design and the process applied for the analysis of the levee and the upgrade options selection
$15.00
ANCOLD is an incorporated voluntary association of organisations and individual professionals with an interest in dams in Australia.