2015 – Rehabilitation of Calueque Dam: Challenges and successes

P C Blersch, W van Wyk , R Steenkamp

Construction of the partially completed Calueque Dam on the Cunene River in Angola was abandoned in 1976 due to the hostilities in Angola. In 1988 the dam was bombed, causing significant damage to the bridge deck, other structures and equipment. Work to complete and rehabilitate the dam commenced in late 2012 and included major earthworks, extensive concrete repairs and refurbishment and installation of mechanical equipment, including ten spillway radial gates and two outlet gates with lifting equipment, emergency gates and cranes, including electrical and control systems. A number of challenges were encountered in planning and executing the project but were overcome largely as a result of detailed historical project information having been retained well beyond the norm and through the involvement of a key member of the original project team in the current project.
Keywords: Dam rehabilitation, radial gates, zoned earthfill embankment

Buy this resource

$15.00

IMPORTANT NOTICE

System maintenance will be performed on the servers that host the ANCOLD Digital Guidelines, on Saturday, December 21st @ 10:00 PM AEDT which will require the servers to reboot.

Total downtime during that event could be up to 4 hours and will commence sharply at 10 pm AEDT.  During that time end users will not be able to view or access their secured content.