Richard Herweynen, Tim Griggs, Alan White
The Ministry of Public Utilities, Sarawak, Malaysia used an independent dam safety consultant to advise them on whether the Murum Dam was ready for impoundment. They were looking for a holistic assessment of the dam from a dam safety perspective. As a result, a risk framework was adopted to identify the key issues that needed to be addressed prior to impoundment of the Murum Dam. The process adopted which is presented in this paper, was transparent and defensible; and provided a reasoned approach for which items must be completed prior to the commencement of impoundment. As a result effort was focused on the key activities required prior to impoundment – whether this was the completion of specific works, the availability of key instrumentation to monitor the dams performance, the availability and operation of key dam safety systems, or the appropriate emergency preparedness should a dam safety incident occur during first filling. This systematic process based on a risk based approach, was a useful method of determining the dam’s readiness for impoundment, and provided an excellent way of communicating the importance of activities to the key stakeholders. The authors believe that this method is transferable to other dam projects, for an assessment of a dam’s readiness for impoundment.
Keywords: Dam safety, risk, impoundment, reservoir filling.
$15.00
ANCOLD is an incorporated voluntary association of organisations and individual professionals with an interest in dams in Australia.
System maintenance will be performed on the servers that host the ANCOLD Digital Guidelines, on Saturday, December 21st @ 10:00 PM AEDT which will require the servers to reboot.
Total downtime during that event could be up to 4 hours and will commence sharply at 10 pm AEDT. During that time end users will not be able to view or access their secured content.