Pouya Amirsayafi
Chahnimeh reservoirs with 1.4 billion cubic metres storage capacity have a critical role in water supply for both drinking water and agricultural purposes for the whole Sistan region in eastern Iran. Sistan river used to be the only source for agricultural purposes, so that several gated diversion weirs were constructed on the river in the past 50 years. Because of climate change and upstream development causing flow fluctuations, the river alone is no longer a reliable source for irrigation purposes. So the idea of storing water in Chahnimeh reservoirs and optimised operation of reservoirs have become a necessity. In order to achieve this, development of structures to have efficient operational plan of the river and reservoirs system is underway.
Several projects have been built for more efficient use of the reservoirs, some projects still being designed. One of the latest is the project of “Development of Operational Infrastructures for Chahnimeh Reservoirs” designing a structure to regulate flow between Chahnimeh I and III reservoirs. This kind of structure operating between two connecting reservoirs is so rare, so that innovation is needed to design a cost effective structure covering different operational conditions. Different structures were investigated and the summary of selection of structure types are presented. The paper illustrates challenging design of the project, useful for engineers who might be or will be dealing with such a project. By designing gates with pre-compressed rubber sealing, huge amount of costs associated with having two different gates for different directions of flow are avoided. Because of saturated foundation, by designing a diversion system between two reservoirs, it is possible to undertake pre-consolidation of foundation soil and to drain saturated foundation water. This would reduce settlement of the foundation of the structure after construction to the extent that by construction of a pile group, the gated structure will perform with high reliability for gates function. This type of structure is so rare and the methods and experiences of the presented design can be used by other engineers and consultants in similar projects. The estimated cost of the project is 15 million dollars and with construction under way, completion is expected in 2017.
Keywords: regulating structure, gates, reservoirs, reservoir operation
$15.00
ANCOLD is an incorporated voluntary association of organisations and individual professionals with an interest in dams in Australia.
System maintenance will be performed on the servers that host the ANCOLD Digital Guidelines, on Saturday, December 21st @ 10:00 PM AEDT which will require the servers to reboot.
Total downtime during that event could be up to 4 hours and will commence sharply at 10 pm AEDT. During that time end users will not be able to view or access their secured content.