Suraj Neupane, Paul Southcott, and Tung Hoang
Conglomerate Dam has multiple cracks along the asbestos cement outlet conduits running through the embankment. The reservoir level has been maintained at 2m below the full supply level to reduce the amount of seepage, emerging on the downstream face, until the conduits are repaired and protect the embankment from slope instability and piping. Several methods were investigated under an options study to determine the most suitable internal lining method. Slip lining with polyethylene pipe was found to be the most suitable method in terms of technology as well as cost.
$15.00
ANCOLD is an incorporated voluntary association of organisations and individual professionals with an interest in dams in Australia.
System maintenance will be performed on the servers that host the ANCOLD Digital Guidelines, on Saturday, December 21st @ 10:00 PM AEDT which will require the servers to reboot.
Total downtime during that event could be up to 4 hours and will commence sharply at 10 pm AEDT. During that time end users will not be able to view or access their secured content.