Suraj Neupane, Paul Southcott, and Tung Hoang
Conglomerate Dam has multiple cracks along the asbestos cement outlet conduits running through the embankment. The reservoir level has been maintained at 2m below the full supply level to reduce the amount of seepage, emerging on the downstream face, until the conduits are repaired and protect the embankment from slope instability and piping. Several methods were investigated under an options study to determine the most suitable internal lining method. Slip lining with polyethylene pipe was found to be the most suitable method in terms of technology as well as cost.