Peter A. Ballantine
In view of the need for a safety upgrade for the Quipolly Dam and the plans of Liverpool Plains Shire Council for future growth in water supply, the Council took the opportunity to increase the storage capacity of the dam by raising the full supply level by 2.0 m. In 2009, the Council appointed GHD to design the upgrade in accordance with the ALARP principle.
The design of the dam included an innovative vertical crest wall, embedded into the embankment, a concrete-lined auxiliary spillway placed over the embankment adjacent to the existing spillway and the installation of Hydroplus Fusegates in the existing spillway channel.
This paper describes the design of the upgrade works.
$15.00
ANCOLD is an incorporated voluntary association of organisations and individual professionals with an interest in dams in Australia.
System maintenance will be performed on the servers that host the ANCOLD Digital Guidelines, on Saturday, December 21st @ 10:00 PM AEDT which will require the servers to reboot.
Total downtime during that event could be up to 4 hours and will commence sharply at 10 pm AEDT. During that time end users will not be able to view or access their secured content.