2011 – Where is our Weir going – an Unusual Upgrade!

 Amanda Ament, Jon Williams, Malcolm Barker

Aplins Weir is located on the Ross River in Townsville, downstream from the Ross River Dam. Previous work had identified Aplins Weir as exhibiting factors of safety below 1.0 under normal operating conditions, with over 1000 persons at risk today in the event of failure. Originally constructed in the early 1920s, Aplins Weir has been upgraded and repaired following various failures on a number of occasions. The end result is a complex reinforced concrete and steel sheet pile composite structure reliant for stability on a number of unreliable components. This paper presents the historical data describing the current configuration of the weir, and the analyses required to evaluate the extisting structure, leading to the design of the proposed upgrade works. The final design involves a retrofit of large diameter cast-in-place lined piles and a heavily reinforced base overlay slab designed to completely bypass all existing vulnerable substructure elements.

2011 – Where is our Weir going – an Unusual Upgrade!

Buy this resource

$15.00