Kirsty Carroll, Kelly Maslin, Richard Rodd
Melbourne Water manages over 210 retarding basins across Greater Melbourne ranging in size from 4ML to 4700 ML with embankment heights from 0.3m to 10m. Over the years the basins have been designed and constructed by a range of different owners and authorities. Varying design and construction standards with the majority of retarding basins generally being located in highly urbanised areas, has resulted in Melbourne Water having a large portfolio of assets that have potential to pose a significant risk to the downstream communities they are designed to protect.
High level hazard category assessments completed over the last10 years identified that approximately 90 structures were either High or Extreme hazard categories based on the ANCOLD Guidelines on Assessment of the Consequences of Dam Failure.
In an attempt to identify retarding basins requiring priority consideration for remedial works Melbourne Water embarked on a process of completing a dam safety risk assessment for five of the retarding basins in accordance with the ANCOLD Guidelines on Risk Assessment. The objective of the risk assessment was to develop an understanding of the key risk issues that might affect retarding basins as distinct from water supply storages, identify potential remedial works and develop a prioritised risk management strategy for the five basins considered. In completing the risk assessment there was also significant discussion about ways to streamline the process to allow assessment of the remaining basins.
This paper details the results obtained from the risk assessment, investigates the application of the base safety condition and implementation of a risk management strategy. It also looks at similarities between sites to enable common upgrades to be implemented across the range of retarding basins. This paper also discusses the need for guidelines specific to retarding basins to be developed.
How do you solve a problem like retarding basins? An asset owner’s perspective
$15.00
ANCOLD is an incorporated voluntary association of organisations and individual professionals with an interest in dams in Australia.
System maintenance will be performed on the servers that host the ANCOLD Digital Guidelines, on Saturday, December 21st @ 10:00 PM AEDT which will require the servers to reboot.
Total downtime during that event could be up to 4 hours and will commence sharply at 10 pm AEDT. During that time end users will not be able to view or access their secured content.