Malcolm Barker, Toby Loxton
The Gladstone Area Water Board (GAWB) owns and operates Awoonga Dam, which is a concrete-faced rock fill embankment with a fixed crest concrete spillway on the left bank impounding a storage volume of 770,000 ML.
The current arrangement can accommodate the Probable Maximum Flood, allowing for flow over Saddles 3, 4 and 6 on the left abutment. A comprehensive study was carried out to evaluate the erosion potential downstream from Saddles 3 and 6 as well as other spillway options adjacent to the existing dam. One option was a radical approach including the removal of the Saddle Dam 3 and provision of downstream erosion protection works. This reduced the PAR and improved the overall dam flood capacity; however concerns were expressed about the environmental impact of possible erosion downstream from Saddle 3 for relatively frequent events.
A risk assessment showed that the erosion protection works downstream from the Saddle 3 or 6 were not cost effective and the preferred option for the upgrade was the closure of the Saddle Dam 3 with an auxiliary spillway created in Saddle 6,
This paper summarises the methods used and the outcomes from this study.
$15.00
ANCOLD is an incorporated voluntary association of organisations and individual professionals with an interest in dams in Australia.
System maintenance will be performed on the servers that host the ANCOLD Digital Guidelines, on Saturday, December 21st @ 10:00 PM AEDT which will require the servers to reboot.
Total downtime during that event could be up to 4 hours and will commence sharply at 10 pm AEDT. During that time end users will not be able to view or access their secured content.