Thomas Vasconi, Mike Gowan
This paper describes the methodology adopted for the design of a 180 m-high stepped chute spillway to be constructed on a mine tailings storage facility (TSF) in Africa. This TSF dam, constructed using the “downstream method”, will be raised progressively via a series of nine lifts as mining proceeds. The first eight will be equipped with an operational spillway sized for the 1in 10,000 AEP whilst the ninth will house the closure spillway sized for the Probable Maximum Flood. The problem, common to all staged tailings dams, is how to design the spillways for such raising sequence? The very steep ridge declivity favored locating them in a unique configuration rather than the more usual separate hillside spillway on each dam abutment. The design of such spillways was challenging since it had to integrate the TSF interdependency parameters (water balance, dam raise sequence) whilst including flood routing, spillway sizing, stepped spillway design components. Challenging aspects of the design also included optimizing the costs associated with the short service life of these spillways. Furthermore, the design was undertaken in a way that the operating stepped chute could be upgraded and reused at mine closure. The design incorporates an innovative solution which allows reduction in the rock armouring quantity of up to 40% with associated cost benefits, and sustainability in terms of material usage. The lessons learnt in applying this innovative and sustainable design are useful for other sites requiring adaptive construction and short service life spillways.
Keywords: Tailings storage facility, stepped chute spillway, hydrology, hydraulics, mine water management.
$15.00
ANCOLD is an incorporated voluntary association of organisations and individual professionals with an interest in dams in Australia.
System maintenance will be performed on the servers that host the ANCOLD Digital Guidelines, on Saturday, December 21st @ 10:00 PM AEDT which will require the servers to reboot.
Total downtime during that event could be up to 4 hours and will commence sharply at 10 pm AEDT. During that time end users will not be able to view or access their secured content.