The Tarong coal-fired power station near Kingaroy in southern Queensland discharges ash to a storage facility of 42,000 ML capacity, impounded by a 48 m high-zoned earth and rockfill dam embankment. The embankment was constructed in 1980–81. In recent years, Tarong Energy Corporation (TEC) has investigated a number of options for a new storage facility as the remaining capacity of the existing ash dam storage diminishes. TEC determined that the existing facility should be upgraded to provide additional storage capacity for the short term. At the same time, there emerged a requirement to improve the long-term seismic resistance of the embankment. Enlarging the existing spillway cut provided the material for a 400,000 m3 weighting zone and, by reducing the design flood freeboard, extended the ash disposal capacity by several years without a need to raise the embankment. Challenges included significant foundation seepage and deteriorated riprap. The paper describes the issues, risks, adopted criteria, investigation undertaken, and implementation of the upgrading works. Innovative approaches to the provision of future storage capacity are outlined.
$15.00
ANCOLD is an incorporated voluntary association of organisations and individual professionals with an interest in dams in Australia.