2004 – 3 Jindabyne Dam Spillway Upgrade and Outlet Works

Under the Snowy Water Licence and as a result of the Snowy Water Inquiry, Snowy Hydro Limited
(SHL) is required to release environmental flows into the lower Snowy River below Jindabyne Dam at lake levels as low as the minimum operating level (MOL). The construction of new outlet works is necessary to meet this requirement. The other issue driving the project is the limited spillway capacity. A new spillway is required to pass the design flood recommended in the guidelines of the NSW Dam Safety Committee. The design of the outlet works and new spillway has been completed and a contract to construct the works has been let and construction has commenced. This paper summarises the process used to develop the selected design arrangement. It includes discussion on the design of modifications to the existing spillway and the part played by the hydraulic model study in that design and discussion on the auxiliary spillway design and the design of the outlet works to pass a peak flow of 58 m3/s.

Buy this resource

$15.00

IMPORTANT NOTICE

System maintenance will be performed on the servers that host the ANCOLD Digital Guidelines, on Saturday, December 21st @ 10:00 PM AEDT which will require the servers to reboot.

Total downtime during that event could be up to 4 hours and will commence sharply at 10 pm AEDT.  During that time end users will not be able to view or access their secured content.