A. Ahmed-Zeki, G. Roads
South East Queensland Water Corporation (SEQWater) as owner and operator is proceeding with an upgrade of the flood capacity of Wivenhoe Dam. SEQWater has formed an Alliance with Leighton Contractors, Coffey Geosciences, Montgomery Watson Harza (MWH) and the Department of Commerce-NSW (formerly DPWS, NSW) to upgrade Wivenhoe Dam. This paper presents feasibility level investigation and design activities for an upgrade option, comprising a large labyrinth auxiliary spillway at the right abutment of the dam, for supplementing the existing gated spillway in handling the Probable Maximum Flood (PMF) event. This right abutment auxiliary spillway option incorporates Hydroplus type concrete fuse gates. The investigation so far has proved the technical viability of this option, however, ranking along with the other three options against various criteria will lead to the selection of the preferred upgrade option.
$15.00
ANCOLD is an incorporated voluntary association of organisations and individual professionals with an interest in dams in Australia.
System maintenance will be performed on the servers that host the ANCOLD Digital Guidelines, on Saturday, December 21st @ 10:00 PM AEDT which will require the servers to reboot.
Total downtime during that event could be up to 4 hours and will commence sharply at 10 pm AEDT. During that time end users will not be able to view or access their secured content.