The main iron ore body at Cockatoo Island in the West Kimberleys forms a cliff face plunging steeply into the sea. It was mined by BHP down to low tide level, but the tidal range of 10 metres hampered operations. Being a very pure and sought after ore, various investigations were made to determine methods of extracting the ore below the sea. A coffer dam into the sea was investigated with the conclusion that the soft marine sediments and apparent artesian groundwater in the foundation posed a major risk and high costs.
The mine was sold to a smaller company who proceeded to win useful ore from the island. They also eyed off the undersea ore and approached GHD to use soft ground technology developed for the Derby Tidal Power Project. The soft marine sediments and apparent artesian groundwater conditions were investigated.
The paper describes the design processes involved to achieve dam stability in a space limited by lease boundaries and the desire to maximise the amount of ore that could be accessed. A key to the process was the development of construction techniques and core placement procedures that could cope with the tidal range. Timing aspects were crucial and were controlled by observations of an extensive array of instruments installed for control purposes.
$15.00
ANCOLD is an incorporated voluntary association of organisations and individual professionals with an interest in dams in Australia.