RA Geddes
Over the last 30 years, the demand for water storages in Queensland’s Mary’s River has grown significantly. As a result of this growth in demand it was decided to raise Borumba Dam, the major storage on the system, in two stages The first stage was to be approximately 2 metres in I997 and the 25 metre raising be required in about 2010.
Borumba Dam was completed in 1964. It is a 43 metre high concrete faced dam with a 32 metre long on the left abutment. The first proposal for initial raising was to install a two metre high air-inflated rubber dam on top of the existing crest. However, it was determined that this method of raising presented a number of prob and a new solution was sought.
$15.00
ANCOLD is an incorporated voluntary association of organisations and individual professionals with an interest in dams in Australia.
System maintenance will be performed on the servers that host the ANCOLD Digital Guidelines, on Saturday, December 21st @ 10:00 PM AEDT which will require the servers to reboot.
Total downtime during that event could be up to 4 hours and will commence sharply at 10 pm AEDT. During that time end users will not be able to view or access their secured content.