1998 – Developments in Extreme Flood Estimation Techniques – Hume Dam: A Case Study

J. H. Green and P. I. Hill

Early Probable Maximum Flood (PMF) studies and spillway adequacy assessments for Hume Dam adopted the standards based approach of the time. Since then considerable work and thought has gone into the estimation of extreme floods – both the philosophy and the practice. These changes include the general change in emphasis away from a standards based approach and towards risk assessment; the move towards an AEP-neutral approach for the transformation of extreme rainfalls to extreme floods; and the redefinition of both the PMP and the PMF.

This paper details the effect these and other changes to extreme flood estimation techniques have had on the perceived adequacy of the Hume Dam spillway to pass extreme floods.

Buy this resource

$15.00