2019 – The Lessons Learned and Construction Challenges for the Leslie Harrison Dam Upgrade $15.00 More info
2017 – Application of Risk Assessment to an Emergency Levee Design in an Urban Environment $15.00 More info
2013 – Design considerations in the continuous concrete buttressing of existing concrete gravity dams $15.00 More info
2012 – Reducing Uncertainties in Safety Assessments of Aging Dams through Site Specific Investigations $15.00 More info
2012 – Modernisation of the Glenelg Gates Structure within a Residential Area to meet Operational and Dam Safety Criteria $15.00 More info
2011 – Awoonga Dam Acceptable Flood Capacity design – the anguish of erosion risk and implications for design $15.00 More info