2017 – Steel Fibre Combined with Conventional Reinforcing Joint Free Spillway Chute–Key Elements for Durability and Serviceability $15.00 More info
2017 – Spillway Concrete Scour Detection and Repair at the Base of an 84m High Arch Dam $15.00 More info
2016 – Investigation of the Foundation, Sub-surface Drainage and Slab Anchor Degradation of a Concrete-lined Spillway: Fairbairn Dam, Queensland $15.00 More info
2013 – Managing the risk of under-designed spillway training walls: an owner’s guide $15.00 More info
2010 – A Unique and Holistic Approach to the Erodibility Assessment of Dam Foundations $15.00 More info
2008 – Design considerations for upgrading SunWater’s dams for acceptable flood capacity $15.00 More info
2007 – Computational fluid dynamics models and physical hydraulic modelling – do we need both? The design of the Hinze Dam Stage 3 $15.00 More info
2006 – Investigations and Design of Remedial Works at Millbrook Dam in South Australia $15.00 More info
2003 – Increasing Storafe Capacity at Dartmouth Regulatory Dam with Fusegates: The Construction Stage $15.00 More info