2023 – Below the Tolerability Line and Beyond – A Practical Contemporary As Low As Reasonably Practicable (ALARP) Methodology for Dams $15.00 More info
2017 – Application of Risk Assessment to an Emergency Levee Design in an Urban Environment $15.00 More info
2016 – Would Bowties and Critical Controls Contribute to the Prevention of High Consequence / Low Frequency Dam Failures? $15.00 More info
2016 – Kangaroo Creek Dam Embankment Raising and Stabilisation – Balancing Competing Objectives $15.00 More info
2011 – Awoonga Dam Acceptable Flood Capacity design – the anguish of erosion risk and implications for design $15.00 More info
2008 – Risk assessment in spillway remedial works design and construction and monitoring at Googong Dam $15.00 More info
2005 – Use of Risk Based Design Validation for Justification of the Ross River Dam Upgrades $15.00 More info
2005 – Use of Risk Based Design Validation for Justification of the Ross River Dam Upgrades $15.00 More info