2010 – Using a clay cemented sandstone as RCC aggregate – a major breakthrough at Wyaralong Dam $15.00 More info
2010 – Unique Approach of an Integrated Design for a Challenging 180 Metre High Stepped Spillway $15.00 More info
2010 – U.S. Army Corps of Engineers Dam Safety and Asset Management of Mechanical /Electrical Systems for Dams $15.00 More info
2010 – TOWARDS UNDERSTANDING A KARST FOUNDATION: USE OF A THREE DIMENSIONAL FOUNDATION MODEL AT DARWIN DAM $15.00 More info
2010 – Response and failure prevention, following the identification of a major lining defect in the Tekapo Canal, New Zealand $15.00 More info
2010 – Mildura Weir Denil Fishway An Innovative Fish Passage Solution for a Unique Site $15.00 More info
2010 – Innovations in resolving construction challenges on the Catagunya Dam Restoration Project $15.00 More info
2010 – Hidden Valley – Design and Construction of Highland Papua New Guinea First Tailings Dams $15.00 More info
2010 – Googong Dam Spillway Upgrade – Construction Challenges and Alliance Framework $15.00 More info
2010 – Construction for Destruction: Downriver Diversion Dam Modifications Required for Matilija Dam Decommissioning $15.00 More info
2010 – Challenges Associated with Identifying and Analysing Potential Failure Mechanisms in Dam Foundations – Taum Sauk Upper Reservoir Dam & Wyaralong Dam Case Studies $15.00 More info
2010 – Application of Available Climate Science to Assess the Impact of Climate Change on Spillway Adequacy $15.00 More info
2010 – Analysis and Design Challenges Associated with the Catagunya Dam Restoration Project $15.00 More info
2010 – Advantages gained from the use of a geomembrane waterproofing system on RCC dams: experiences from Australia $15.00 More info
2010 – A Unique and Holistic Approach to the Erodibility Assessment of Dam Foundations $15.00 More info
2010 – A risk-based re-evaluation of reservoir operating restrictions to reduce the risk of failure from earthquake and piping $15.00 More info