2008 – Tools for predicting probability of failure of mechanical/electrical systems for dams $15.00 More info
2008 – Risk assessment with uncertainty analysis for an already-initiated failure mode $15.00 More info
2008 – Proposed changes to the UK Reservoir Safety Legislation to incorporate a risk based approach and the problems the UK faces into future $15.00 More info
2008 – Probabilistic Description of Scour Hole Downstream of Flip Bucket Spillway of Large Dams $15.00 More info
2008 – Implementing upstream fish passage at an existing large dam: Hinze Dam trap and haul fishway $15.00 More info
2008 – Hinze Dam Stage 3 – development of the geological model and the implications for design $15.00 More info
2008 – Geotechnical risk assessment and management for hydropower development sites in the Indian Himalaya $15.00 More info
2008 – Design considerations for upgrading SunWater’s dams for acceptable flood capacity $15.00 More info
2008 – Design and construction of a flood mitigation dam on the North Para River, using high-paste RCC $15.00 More info
2008 – Construction of the first cut-off wall by Low Headroom Cutter inside a dam tunnel in China $15.00 More info
2008 – Construction of a full height filter buttress against a full reservoir at Dee Dam $15.00 More info
2008 – Application of procedures for estimation of rock erosion for overflow of dams – illustrated by application to Julius Dam, Queensland $15.00 More info
2008 – An overview of concrete lined stilling basin and spillway scour engineering risk assessment tool for US Army Corp of Engineers dams $15.00 More info
2008 – “When is a dam not a dam?”- Design of mine tailings storage facilities for closure $15.00 More info
2008 – Risk assessment in spillway remedial works design and construction and monitoring at Googong Dam $15.00 More info