2003 – SPILLWAY GATE RELIABILITY AND HANDLING OF RISK FOR RADIAL AND DRUM GATES

This paper discusses reliability issues of the fourteen 3.85m high by 7.89m wide radial gates at Glenmaggie Dam in Victoria and the twin 3.6m high by 16.5m wide drum gates at Little Nerang Dam in Queensland. The Glenmaggie dam radial gates are manually controlled using electrically driven (mains and diesel generator power supply) hoist motors with a petrol driven hydraulic pack for use in the event of complete electrical power supply failure. A detailed fault tree analysis was developed for the spillway gate reliability of the Glenmaggie Dam gates as part of the risk assessment for the dam, which was being completed at the time of publishing the paper. Each of the identified components of the spillway gates, including human error in operation was used to evaluate the probability of failure of a single gate or multiple gates for inclusion in the event tree to estimate the risk and assist the evaluation of the requirement for remedial works. The Little Nerang drum gates are fully automatic hydraulically operated gates with independent operating mechanics and a common override system in the event of automatic system failure. Drum gates are uncommon on dams and the system operation is discussed together with an assessment of the reliability and measures taken for handling operating risks during floods for the dam, which has some stability concerns.

Buy this resource

$15.00